COMPLETE BUS BODY TO BE MOUNTED ON COMPLETE CHASSIS
We have dedicated to design and supply bus and coach body for 9 years.
Body parts includes:
steel structure, windshields and window glass; aluminum luggage panels, FRP front and rear wall and top roof, rear view mirror, bus seat, dashboard assy, aircon channel, air condition, wheelchair ramp, LED destination board, headlight and tail lights, handrail fittings, and other plastic , ABS materials.
Meanwhile, we are able to customize special product in according with drawings and samples.
we are able to supply technical support and workers training about bus assembly.
We are searching partners to build series oversea bus assembly line plant, which will be distributed in the developing countries, including East Africa, west Africa, the Middle East, South Asia, southeast Asia and Latin America.
1, Turn Key Project: a turnkey project is a project in which separate entities are responsible for setting up a plant or equipment (e.g. trains/infrastructure) and for putting it into operation. It can include contractual actions at least through the system, subsystem, or equipment installation phase and may include follow-on contractual actions, such as testing, training, logistical, and operational support. It is often given to the best bidder in a procurement process.
2, Establish joint venture SKD CKD bus assembly line plant.
3, Other Agreement cooperation mode.
1, Fund: have some economic strength, investment capacity over one million USD.
2, Bus assembly line workshop: 5000 square meter workshop at least, and over 15000-20000 square meters land.
3, Market channel: have car sales channel (sales network) or car garage remanufacturing second-hand car, or with the car related businesses.
4, Import tariff policy: You country import tariff policy very nice, gap of import tariff between auto spare part CKD (completely knocked down) term and CBU (complete built unit) shall be at least 30-35%;
for example, import tariff on CBU term is 35%, CKD term must be 5% or free. This term is most important factor for setting up an assembly plant in local.